Exploring CABE: Upholding Excellence in Building Engineering
October 8, 2024Transforming BIM4Housing: A Journey of Innovation and Impact
November 7, 2024Unpacking the Digital Golden Thread With Hydrock
The purpose of the ‘golden thread’ is to have the right
information in order to understand the building and the steps needed to keep
both the building and the people living in it safe.[1]
The use of the Digital Golden Thread evolve during a project. The requirements
for the Digital Golden Thread are mapped across various legislation, depending
on whether its design and construction or occupation and every Duty-holder
needs to play their part at some point to assist with its compilation. There
are some exceptions for certain works when requirements vary for the Golden
Thread, i.e. for scheme works.
The Digital Golden Thread is an initiative which the Client
initially needs to drive by setting up a ‘electronic facility’ to handle and
share the information. The Client must establish this system before
construction starts and upload the relevant information. Arrangements for the
Digital Golden Thread are to be stated at Gateway 2 in the Construction Control
Plan. Under Regulation 38 of The Building (Higher-Risk Buildings Procedures)
(England) Regulations 2023 the person signing off the Golden Thread must give
an acknowledging receipt stating the Golden Thread is accessible and sufficient
for them to understand, operate and maintain the building- HUGE legal
ramifications ALERT!
There is no easy win for a concise definition and the exact documents the
Golden thread entails but SI 41/ 2024, The Higher-Risk Buildings (Keeping and
Provision of Information etc.) (England) Regulations 2024 list the typical deliverables
required in the Digital Golden Thread in Schedule 1.
My first ever ‘gap analysis’ of Digital Golden Thread compliance was for a
building located in Watford which was subject to transitional arrangements, but
the report resulted in our Client walking away from the purchase of a building
because the information was not sufficient to understand, operate and maintain
the building- Granted some of the information missing was from requirements
under the new legislation which made those bits excusable, but a lot of the
information highlighted as missing was just standard project information so
after some to and fro the Client decided they did not want it open a can of
worms and abandoned ship! We may see more and more people instructing gap
analysis of the Digital Golden Thread, Fire and Emergency files and GW
applications in advance to avoid challenges on the eleventh hour.
In the next article we will be looking in more detail around the real world
implications of the Digital Golden Thread.
Mandeep Singh Gill | Associate (Building Safety Act and Digital Golden
Thread) | Hydrock, now Stantec
[1] https://buildingsafety.campaign.gov.uk/building-safety-regulator-making-buildings-safer/building-safety-regulator-news/understanding-the-golden-thread/